Steel punishes sloppy planning more than almost any other cargo. It is dense, so a container reaches its weight limit long before it looks full. It rusts, so a few days of condensation can turn a saleable coil into a claim. It is awkward, so a load that was fine on paper turns into a problem when the vehicle reaches a yard with no crane. Nostrac Shipping moves steel and non ferrous metals for mills, stockholders, fabricators and traders, and the value we add sits in the detail: how the cargo is secured, how the weight is distributed, how the paperwork lines up with the material, and what happens at the delivery end. Get those right and steel is a straightforward, repeatable movement.
The product form decides the equipment, not the other way round:
Five failure points account for most of the trouble we are asked to fix:
The sequence we follow on every enquiry:
In practice the payload limit is reached well before the space is. Dense products such as coil, plate and bar hit the maximum permitted weight with the container looking part empty, and a 20ft box is often the better unit for heavy material. The real constraint is usually the road leg at destination, because a container that is legal at sea can be over the axle limits on the truck. We work backwards from the delivery country's road limits when we plan the loading.
By deciding the protection at the loading point, not at the port. Depending on the material and the route that means desiccant bags sized to the container volume, a liner or barrier bag, VCI paper or film in contact with the surface, oiled or coated finishes, and timber dunnage so the cargo is not sitting against a cold steel floor. The other half of it is timing: cargo that sits in a container for weeks after arrival is far more exposed than cargo that is cleared and unloaded promptly.
Yes. Anything beyond internal container length goes on a flat rack, an open top or as a breakbulk parcel on a suitable vessel. We need the exact length, width, height, weight and lifting points, and we confirm what can be received at the delivery site. It is normally cheaper to move a long product properly once than to cut it and lose value at the far end.
The mill or the loading warehouse does the physical work, but we specify how it is done and we put it in writing before the vehicle arrives. That covers orientation, cradles or bedding, chocking and the number and type of lashings. Where the shipment is high value or the receiver is strict on condition, we arrange supervision and photographic records at loading.
Commercial invoice, packing list with bundle marks and weights, the transport document, and mill test certificates with heat numbers where the buyer or the end use requires them. Certificates of origin are often needed as well. The important part is consistency, because a heat number on a certificate that does not appear on the packing list will stop the goods at the receiver's gate.
Yes, with the right vehicle. That means a crane mounted vehicle, a side loader for containers, or a vehicle that can tip or roll the load off, selected against the piece weight and the ground conditions. We ask about access, hardstanding and offloading equipment at the quotation stage because it changes the vehicle and the price.
Regular movements between the United Kingdom and Europe, Turkey, the Middle East and the United Arab Emirates, plus Asian origins and the Central Asian corridors through Kazakhstan where we have an established presence. Tell us the origin mill or port and the delivery point and we will set out the realistic options with the transit time for each.
Talk to Nostrac about your requirements and we will tell you what is realistic before you commit to it.
The 5 Minute Shipper is our weekly briefing on freight rates, capacity, customs and the routes our clients actually use. Written for importers, exporters and manufacturers. Five minutes to read, free, one click to leave.
Contact Nostrac Shipping to discuss your freight forwarding requirements.