Moving a machine is not a freight problem with an engineering footnote. It is an engineering problem with a freight leg in the middle. The questions that decide whether it goes well are asked long before a vessel is booked: where can this be lifted, what does it weigh with the crate on, will it pass through the factory door at the other end, and who is taking responsibility for disconnecting and recommissioning it. Nostrac Shipping moves machine tools, production lines, generators, presses and complete plant for manufacturers, dealers and end users, and we work backwards from the installation point to the loading bay so that the last hundred metres, which is where these jobs usually fail, is planned first.
Machinery covers a wide range of jobs, and each needs a different answer:
Preparation is where the cost and the risk are decided:
The transport plan runs from the factory floor to the installation point:
We coordinate it. Dismantling, disconnection, rigging and recommissioning are carried out by specialist engineers or by the manufacturer, and we bring them into one plan with the transport so nobody is standing waiting for somebody else. What we will not do is let a job start without agreement in writing about who disconnects, who lifts, who reconnects and who signs off the machine as working.
Compare the crated dimensions, not the machine dimensions, against the internal measurements and door opening of the container, and remember the crate base adds height. Anything over about two and a third metres wide or high once crated usually needs a flat rack or an open top. Send us the dimensions and weight and we will tell you the equipment and the realistic cost difference between the options.
Out of gauge means the cargo extends beyond the dimensions of the equipment it sits on. It costs more because the overhang blocks the slots around it on the vessel, so the line charges for the space that cannot be sold, and because it needs a specific stowage position and additional handling. Fewer services accept it, so booking lead time is longer.
Almost always. Sea passages mean salt air, condensation inside the container and constant vibration, so precision equipment needs barrier wrapping with desiccant, proper bracing to the case and shock protection on sensitive assemblies. Any solid wood in the crate needs ISPM 15 treatment and marking. Good crating adds cost at the front and removes most of the risk of a damaged arrival.
Yes, and it is a different job from shipping new equipment. It needs a site visit, a dismantling sequence, a full marking and inventory system, a plan for how the pieces leave the building and a schedule that fits around production. We work backwards from the date the new site needs the machine running, not forwards from the date the old site wants it gone.
Yes, where the load exceeds normal road limits we handle the route survey, the movement notifications and any escort requirements in the countries involved. The lead time varies considerably by country and by route, which is why the road leg needs to be planned at the same time as the sea leg, not after it.
Cargo insurance on the full replacement value including freight and packing charges, rather than the book value, because a damaged machine needs replacing at today's price. For high value or single source equipment it is also worth considering the cost of the downtime it would cause, which is not covered by standard cargo terms. We can arrange cover and will tell you plainly what it does and does not include.
Talk to Nostrac about your requirements and we will tell you what is realistic before you commit to it.